railpost.in
Southern Railway: Commissioner Of Railway Safety To Conduct Preliminary Inspection - RailPost.in
Padil - Kulasekhara doubling work for a length of 2.26 Km (including a new tunnel of 780 m on the Up line) is the 4th and final stage of 19 km patch doubling work between Mangaluru Junction and Panambur.