ER Asansol Division: Automatic Block Signalling commissioned between Mugma and Kalubathan

Eastern Railway (ER) has successfully commissioned Automatic Block Signalling (ABS) in the Mugma–Kalubathan section of Asansol Division.

This includes replacement of the existing track-detection systems with advanced Multi-Section Digital Axle Counters (MSDAC).

The up-gradation will improve signalling reliability, enhancing sectional capacity and facilitating smoother train operations. Major works completed include:

  • Replacement of 11 existing signals with modernised signalling arrangements.
  • Replacement of 2 Audio Frequency Track Circuits (AFTCs) and 25 DC Track Circuits with dual Multi-Section Digital Axle Counter (MSDAC) systems, providing reliable and redundant train-detection arrangements
  • Installation of a new Integrated Power Supply (IPS) system at Kalubathan Station to ensure reliable and uninterrupted power supply to signalling equipment
  • Commissioning of relay-based Automatic Block Signalling between Mugma and Kalubathan, along with provision of a new Auto Hut near Level Crossing Gate No. 6 in the section
  • Provision of dual Visual Display Units (VDUs) at stations for real-time monitoring and display of Automatic Block Signalling indications and status


Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Exit mobile version