
Central Railway (CR) successfully commissioned Automatic Block Signalling (ABS) in the 19.42-km Dipori – Chandur – Malkhed section, of Nagpur Division, on November 19, 2026.
With this, ABS has now been extended from Wardha up to Malkhed, covering a total distance of 70.36 km and 9 stations. This will further enhance the section capacity of the Nagpur – Wardha – Badnera section. Nagpur Division now has a total of 121.61 km of ABS section (Ajni – Tumsar Road and Wardha – Malkhed).
The commissioning involved alteration in Electronic Interlocking (EI) at three stations, namely Dipori with Siemens EI of 29 routes, Chandur with Hitachi EI of 30 routes and Malkhed with Hitachi EI of 32 routes.
Four-aspect auto signalling with Siemens make MSDAC with supervisory track section and Auto Reset mode has been provided, along with commissioning of 22 new Auto signals and 14 Semi-Auto signals. LC Gate No. 69A, the existing interlocked gate, has been modified to suit Auto Signalling in the Chandur – Malkhed section, while 48-fiber OFC and UFSBI integration has been done for redundancy.
Safety and reliability have been further enhanced with Earth Leakage Detectors (ELDs), Fuse Alarm System and RDSO-approved Fire Alarm System.This commissioning will significantly improve train mobility, line capacity and operational flexibility, while ensuring enhanced safety.
CR Pune Division commissions Kavach on Puntamba- Sainagar Shirdi section
Central Railway (CR) successfully commissioned the Standard Kavach system in the Puntamba Junction – Sainagar Shirdi section of Pune Division, Central Railway, on November 14, 2026.