IR Budget FY27: New additions to traffic facilities & yard re-modelling projects

Indian Railways (IR) has identified several new traffic facilities / yard modifications / re-modelling / loop line construction projects to its existing list in the budget document for 2026-27. The zone-wise list of such projects are as follows:

Bhusawal marshalling yard

Central Railway (CR)

  • Jalgaon – Yard remodeling
  • Bhusawal control office – Creation of new control board by splitting up BSl-BD section
  • Bhusawal coaching complex – Yard remodelling for augmentation of facilities
  • Jalamb station – Yard remodeling for rectification of defective layout
  • Dhule Station – Extension of passenger platform and stabling line
  • Provision of pedestrian underpasses (10 Nos) on BSL-KNW & BSL-BD sections
  • Provision of pedestrian underpasses (11 Nos) on IGP-BSL & MMR-ANK sections
  • Ghoti – Extension of UP & DN loop line to achieve 753 M CSR
  • Maheji – Extension of Up & DN loop line to achieve 753 M CSR
  • Waghoda – Extension of Up and DN loop line to achieve 753 M CSR
  • Nasik – Provision of two stabling lines in DN direction
  • Odha – Yard remodeling for provision of Long Haul facilities
  • Walgaon station – Yard remodelling for provision of second Up & DN loop (800 M CSR)
  • Chandur Bazar station – Yard remodelling for provision of second Up & DN loop (800 M CSR)
  • Devlali station – Yard remodelling for provision of additional platforms for Kumbh Mela 2027
  • Igatpuri – Extension of platform lines No 1, 2, 3 & 4
  • Bhivandi Road – New loop line to deal full rake parcel (710 m)
  • Kasara – Extension of receipt & despatch lines
  • Kalyan-Lonavla – Provision of 14 Subways for Pedestrian or Cattle crossing
  • Jasai – Connectivity from IOTL to JASAI-DRT line
  • Mohape – Provision of bi-directional additional loop line
  • Jite – Provision of additional loop line on UP side
  • Conversion of directional loop line into bi-directional loop at Vangani, Bhivpuri Road & Kharbao Stations
  • Igatpuri Titoli yard – Development of pit line and stabling facilities
  • Boribial – Provision of additional loop lines with yard remodeling

East Coast Railway (ECoR)

  • Paradeep – Long haul loop towards Cuttack end near coaching yard
  • Provision of Intermediate Block Signalling (IBS) between Tapang–Nirakarpur
  • Provision of IBS between Ganjam–Chatrapur
  • Provision of IBS between Jagannathpur–Brahmapur
  • Jenapura – Additional loop line
  • Similiguda–Karakavalasa – Yard modifications for Twin Single Line working
  • Naupada–Parlakhemundi – Development of new crossing station at TMB
  • Visakhapatnam–Duvvada – Expansion of exchange yard of VDPD POH from 3 lines to 7 lines

East Central Railway (ECR)

  • Bihta – Yard remodelling (one full-length running line, one full-length stabling line, shunting neck)
  • Dumraon – Yard remodeling (construction of new DN common loop)
  • Daniyawan – Proposal for two new goods lines (750M)
  • Rakhitpur – Provision of one additional loop for development of freight terminal
  • Provision of IBP between Kathautia–Katkamsandi
  • Provision of Intrusion Detection System in GC Section of DHN Div for monitoring elephant movements
  • Dhanbad (DHN) Yard – Enhancement of coach stabling capacity at coaching depot
  • Provision of sand hump/trap points at CDMR station
  • IBH facility between Rafiganj–Ismailpur
  • Development of half rake siding into full rake siding in UP Direction at AUBR
  • Provision of PI at A cabin and D cabin at MGS
  • Dehri On Sone (DOS) – Yard remodeling for provision of shunting neck
  • Pt. Deen Dayal Upadhyay Junction – Bypass line from East Outer Cabin to GAQ via FOC
  • Garhnokha – Yard remodeling for extra loop line
  • Pipra & Jibdhara – 3rd running line (686 m) with sand humps
  • Pasraha – Development of common user traffic facility for GCT siding
  • Kursela – Yard remodeling work along with provision of shunting neck
  • Danauli Phulwaria & Umesh Nagar – Yard remodeling works for extension of CSL of lines

Eastern Railway (ER)

  • Provision of full-length yard line at Chinpai (CPLE) station
  • Provision of ORL with line no. 3 & extension of HL Platform no. 3 at STN
  • Provision of 06 IBPs to enhance line capacity of STN-JAJ Section
  • Re-arrangement of Ukhra Station Yard lines
  • Barddhaman – Traffic facility works
  • Concrete pathway provision at BTNG beside Line No. 1
  • Rampurhat – Conversion of pit line and passenger stabling line into Dn Loop-1 & Dn Loop-2
  • Talit – Conversion of Up DD Line into Common Loop
  • Provision of safety fencing for rising sectional speed to 130 Kmph in NFK-AZ, NFK-MJP, MLDT-NFK, and JMP-KEUL sections
  • Construction of Pedestrian subway at Km 242/5-7 in connection with speed raising under AEN/SBG
  • Provision of IBS at Maheshi Halt between Akbarnagar-Sultanganj
  • Gede – Yard remodelling work with new PI building
  • Sealdah (Main) – Re-modelling of SDAH yard to accommodate 12 Coaches of EMU Rakes
  • Thakurnagar – Construction of 3rd line (Common Loop)
  • Proposal for Automatic signalling system between Mile5B – Budge-Budge section

North Central Railway (NCR)

  • Agra Cantt – Connectivity with Bayana & Bandikui with overhead alignment
  • Fatehabad – Provision of additional loop line
  • Agra Cantt (AGC) – Provision of 02 platform lines for future traffic growth
  • Govind Garh – Provision of Goods Siding with connecting line no. 3 at both ends
  • Prayagraj Division – Conversion of K-point into motor operated points
  • Prayagraj Division – Signalling and OHE work for connectivity between Shivala Tehu and New Barahan
  • New Makkhanpur – Yard remodelling
  • Bijauli, Bhandai & Mata Tila – Additional loop lines
  • Badausa, Chitrakut Dham & Khoh – 2nd loop lines
  • Jhansi – Enhancement of handling capacity of Defence yard
  • Babina – Extension & modification of defence yard
  • Rairu – Provision of defence siding
  • Manikpur – Up loop line, connection of stabling line to main line and shunting neck

North Eastern Railway (NER)

Rati Ka Nagla – Augmentation of loopline no. 3 CSL to 1.5 Km for long hauling trains

  • Chaubeypur – Provision of 2nd loop at CBR stations
  • Nautanwa – Provision of one full-length stabling line
  • Subhagpur – Brakevan reversal siding
  • Mailani – Provision of two stabling lines (700m each) by modifying the 140-ton crane siding
  • Bakshi ka Talab – Provision of line no-4 with rail level Goods platform
  • Bindaura & Chureb – Provision of UP extended loop lines
  • Motiganj – Provision of DN extended loop line
  • LJN Division – Modification and shifting work of Operations and Traffic Control Office
  • Tinich – Provision of UP & DN extended loop lines
  • BBK-BRCK section – Construction of pathway from Home signal to end of platform

Northeast Frontier Railway (NFR)

  • Jalpaiguri Road-Abhayapuri – Electrical TRD work in-connection with OHE modification for DSDC movement
  • Deotala, Gangarampur & Rampur Bazar – Conversion of D-class stations to B-class
  • New Jalpaiguri – Modification and requirement at station & yard
  • KIR division – Electrical TRD work to remove OHE infringement of DSDC at OLS
  • Senchoa & Haibargaon – Development of goods circulating area & approach road
  • Silghat Town – Pit line, sick line, and water hydrant line

Northern Railway (NR)

  • Himmatana – Provision of second loop line
  • Delhi Subzimandi-Delhi Main – Additional lines
  • Delhi Division – Extension of length of loop lines to full length CSL at 17 stations
  • Patel Nagar – Yard modification & upgradation of signalling gears
  • MAUR – Provision of direct reception/dispatch facilities on relief siding (Goods Loading line)
  • OHE modification works required under ROBs/FOBs in connection with running of DSDC trains
  • Uchana – Extension of length of loop lines
  • Rohtak-Panipat – Provision of a new crossing station between ROK-GHNA
  • Anand Vihar (ANVT) – Extension of platform no. 9 & 2 and construction of shunting neck
  • Ghaziabad (GZB) – Addition & Alteration in yard in connection with 3rd & 4th line connectivity
  • Widening of PFs at CPYZ & DLI ends including track slewing and two stabling lines at GZB
  • Shri Mata Vaishno Devi Katra (SVDK) – IBS between SVDK-Chakarwahal
  • RMJK – Over run proposed to facilitate simultaneous reception
  • Giani Zail Singh Sandhwa – Removal of PSR and facilitating simultaneous reception in GZS yard
  • Baramulla – Provision of one additional loop line
  • Provision of safety fencing (Double W Type) in KUF-AMG and MB-NBD sections
  • Removal of infringements for operation of higher MMD transportation products including DSDC
  • Connectivity of Yara fertiliser siding from BBA loop line

North Western Railway (NWR)

  • Development of BPKH into B class yard with 2 running lines & 4 non-interlocked stabling lines
  • Chittaurgarh-Udaipur City – Provision of one addl. loop line each at 4 stations (PMO, KIN, BSJ, BIML)
  • Hisar – Linking of Hisar Yard with RPHR-STD line to utilize as a double line temporarily
  • Hisar – Provision of stabling lines, marshalling line, and sick/fit coaches line
  • Sriganganagar – Expansion of traffic facilities
  • Lalgarh – Shifting of ARF at LGH yard to facilitate terminal operations
  • BNWS – Additional loop line
  • Kanakpura – Line no 1 and 2 common loop with reception/dispatch facility and siding
  • Nizampur & Khori – Goods shed development and siding extensions
  • Jaipur – Increased the CSR of Line No. 2 with PF up to 700 meters

South Central Railway (SCR)

  • Lingiri-Saidapur – Provision of IB signals on Up and Dn lines
  • Provision of 6 IB signals from DMM to KLU in GY-DMM section
  • Safety fencing/boundary wall provisions across multiple sections (RU-KDP, GDR-TPTY, PMT-KPU, CGTA-WD, PGDP-NDKD, VJA-GNT, TEL-VJA, KZJ-KI, BPQ-KZJ, ASAF-PTKP, MLMG-KI, KZJ-MLMG)
  • Hyderabad Division – New crossing stations (4 Nos)
  • Nizamabad – Remodelling of yard arrangements for additional platforms and a dead-end spur
  • Janakampet Jn – Provision of two additional loop lines
  • Falaknuma & Malkajgiri – Provision of DN loop lines (and 2 additional lines at Malkajgiri)
  • Kacheguda & Lallaguda Gate Halt – Provision of stabling lines
  • Umdanagar – Shifting of crossover no. 18 and provision of additional crossover
  • Nanded Division – Provision of a new control office and standby alternate control
  • PAU-AK section – Provision of additional loop lines at Barsitakali, Kata Road, Navalgaon, Dhamni
  • Provision of subways to facilitate crossing at vulnerable locations (BZA-KI, GY-WD sections)
  • Gullipadu & Anakapalli – Additional loop lines/standard layout provisions
  • Nidadavolu Jn. – Yard remodelling works

South East Central Railway (SECR)

  • LJKR – Construction of long haul loop (CAL-1500m)
  • Lorha – Construction of long haul loop line with bi-directional 3rd line
  • HGR – Provisioning of full rake handling line by extending the DE of UP grid loop

South Eastern Railway (SER)

  • Birarajpur – Provision of additional loop line
  • Banspani & Barbil yards – Development of the goods shed, approach road, and wharf area
  • Chakradharpur Division – Proposal of 07 Railway owned EIMWBs
  • Garposh – Construction of loop line for 3rd line and one sick siding
  • Dharuadih – Construction of long loop line at UP side
  • Tatanagar Marshalling yard – Construction of 2 new lines
  • Shalimar – Construction of a new 60-bedded Running Room
  • Padmapukur – Yard modification with one additional loop line
  • Kolaghat – Installation of 1 in 16 cross-over
  • Amta – Shifting of Stop signal/crossover
  • Nagjua, Boda Gram – Construction of Additional Loop lines
  • Suisa – Increase in CSR of Line no. 2
  • Barkipona – Shifting of cross over and increasing CSL

Southern Railway (SR)

  • Provision of safety W-Beam steel fencing in multiple sections (MS-VM, JTJ, PAZ-BFR, VM-TPJ) for 130 kmph operations
  • Rameswaram – Proposed new platform line Road 5 with yard modifications
  • Palakkad (PGTN) – Provision of one camtech pit line, two stabling lines, shunting neck, sick lines, and yard modifications
  • Mangalore Central – Provision of new 24 coach pit line of CAMTEC standards
  • Walayar-Ettimada & Elattur-Quilandi – Provision of IB signals
  • Tiruchchirappalli (TPT) – Provision of additional loop on Up line as common loop

South Western Railway (SWR)

  • BYPL-DMM Section (DBU station) – Extension of Rd 6 to 580m, slewing Rd 5, and modification in goods circulating area
  • SBC-JTJ Section – Provision of safety fencing with W-Beam metal barrier (108.54 km)
  • Kerkalmatti – Provision of Goods line with Goods PF
  • Provision of IBS between NBL-IDR, LHN-TVL, and CKR-GPB sections
  • YTG, KUG & GNR – Additional loop lines
  • Hampapatnam Halt – Upgradation to a 3-line block station
  • DWR to SUBL – Automatic Block Signalling (24 Kms)
  • Hubballi (UBL) yard – Strengthening of Pitline-1/Stabling

West Central Railway (WCR)

  • Bansa Pahar – Additional loop to accommodate long haul trains
  • Sagma station (Satna-Manikpur) – Extension of up loop lines
  • Gosalpur – Provision of shunting neck and double exit
  • Kaima – Provision of 02 additional loading lines, new shunting neck, and double exit
  • Provision of IBS between Hardua-NMWP in existing UP & DN main line
  • Jabalpur Division – Provision of full OHE wiring on shunting neck at GAR, A&D siding at BHTN, and stabling line at ADTL

Western Railway (WR)

  • Gandhidham Jn Goods shed & C&W Yard – Extension of goods line no. 5, TY line, and stabling lines
  • Sirva – Provision of additional loading line by dismantling existing sick siding and provision of EI
  • Sabarmati Jn. – Provision of 700m additional train accommodation facility with connectivity at SBT A
  • Halvad – Provision of full-length shunting neck (extension by 950m)
  • Ahmedabad New Complex Yard – Converting existing MG pit line into BG stabling line
  • Ahmedabad-Viramgam & Rajkot Division (RJT-HM, WKR-RJT) – Providing cattle fencing for Vande Bharat trains
  • Mahuva – Yard remodeling and provision of additional running line with goods PF
  • Vadal – Developing new loading lines in new Goods Shed
  • Sanosara & Bhimnath – Providing additional loop lines
  • Udhna – Proposal for Rail Level Platform on Bye Pass Line No. 2
  • Hapa – Goods Yard interlocking of Point No. 501/502 & 503/504
  • Khambhaliya – Yard remodeling work for conversion of line no. 04 into running line
  • Ekta Nagar – Providing one loop line
  • Godhra – Reception/Despatch facility of passenger trains on line no. 9 and 10
  • Removal of existing PSR through yard remodelling at Bhalej, Sadnapura, Angadi, Sevaliya, and Tuwa Yards
  • Bharuch – Providing Electronic In Motion Bridge (EIMWB)