Once the doubling of the entire 102 km long Digaru – Hojai section is completed; the train operational capacity of this section under Lumding division will increase. Read more
692 RKM more targeted for electrification by Mar 2022 in SWR Read more
Central Railway’s freight loading from April to October 2021 is the Best and Highest ever during April to October. Read more
The train will also run with revised timings and revised composition with fully unreserved till further advice. Read more
The trains will stop at Thudiyalur and Periyanaikanpalaiayam railway stations with effect from 01.11.2021. Read more
Member OBD stressed on increasing line capacity and speeding up of doubling and tripling projects Read more
Central Railway will operate special traffic blocks at Lonavala including station and yard lines for commissioning of Electronic Interlocking (EI). The blocks will be operated from 27.10.2021 to 30.10.2021. However,… Read more
Diva-Ratnagiri-Diva Daily Special extended from 01.11.2021 to 30.11.2021 Read more
जबलपुर स्टेशन को आकर्षक रोशन दिखने के लिए विभिन्न प्रकार की लाईट्स का उपयोग Read more
Composition: Total 17 Coaches = AC Chair Car - 01 Coach, Second Seating - 14 Coaches, SLR - 02. Read more
