The 22221 Chhatrapati Shivaji Maharaj Terminus – Hazrat Nizamuddin Rajdhani Express will use a Push-Pull rake tomorrow, 13th February 2019, according to officials from Central Railway. Read more
In what may be good news for faster Rajdhani operations, Research Design and Standards Organisation (RDSO) recently issued a speed certificate for a Push-Pull rake configuration between CSMT and New… Read more
In a new measure to enhance safety further, besides reducing costs, Indian Railways has installed a Bogie Monitoring System at Bakkas station on the outskirts of Lucknow. Read more
The first two diesel locomotives of 6,000 hp, manufactured by GE, arrived at the Mundra port on Sunday. Read more
Following a directive from the Railway Board to home electric locomotives in diesel loco sheds, several WAG-5 class locomotives, homed originally at Vadodra (BRC) Electric Locomotive Shed, have been transferred. Read more
Indian Railways (IR) has successfully trialled a WAG-7 class locomotive fitted with regenerative braking. The experimental upgrade was carried out on locomotive number 24517 homed at Jhansi shed. Trials were… Read more
More than half of the existing fleet of WAP-5 class locomotives have already been upgraded to 6,000 HP rating, according to sources in Indian Railways. Read more
IR is experimenting with a relatively new concept in passenger train operations. Read more
IR looks to innovate, make better use of existing resources, tests Push Pull configuration Read more
A decommissioned WCG-2 class locomotive, bearing the number 20158, will now be placed at the Gully, situated near the P D’Mello Road (Platform 18 side) entrance of the CSMT. The… Read more