पूमरे दानापुर मंडल के चाकंद स्टेशन पर नया गुड्स शेड शुरु

पूमरे दानापुर मंडल के चाकंद स्टेशन पर नया गुड्स शेड शुरु Read more »

Presenting the re-done and swanky Bhavnagar Terminus Railway Station

WR redevelops Bhavnagar Terminus Railway Station. Read more »

वाराणसी मंडल रेल प्रबंधक द्वारा वाराणसी –बलिया दोहरीकरण का निरीक्षण

वाराणसी मंडल रेल प्रबंधक द्वारा वाराणसी –बलिया दोहरीकरण का निरीक्षण Read more »

Mission Raftaar: ECR GM inspects works related to 160 kmph speed upgrade

Mission Raftaar: ECR GM inspects works related to 160 kmph speed upgrade Read more »

Yard remodelling in NCR: Trains originating in SR diverted

Yard Remodelling Works at Kosi Kalan(KSV) railway station as a part of the 4th track commissioning in Agra Division, Uttar Pradesh. Read more »

A first on Indian Railways: MoU signed for construction of Road Over Bridges (ROBs)

The work for these ROBs has been assigned to TCIL by Railway Board and TCIL will be paid management fee @ 3.64 % over the project cost. Read more »

Speeds Upgraded to 130 Kmph For 9 Trains On ECR, MPS Raised On Other Sections

East Central has added more trains to the list of services allowed to operate at 130 kilometres per hour on its territory. See details inside Read more »

ER traffic block on Katwa-Bandel line

ER traffic block on Katwa-Bandel line Read more »

झाझा-पटना-पं0 दीनदयाल उपाध्याय जंक्शन रेलखंड पर चलने वाली 09 और ट्रेनों की गतिसीमा में वृद्धि

झाझा-पटना-पं0 दीनदयाल उपाध्याय जंक्शन रेलखंड पर चलने वाली 09 और ट्रेनों की गतिसीमा में वृद्धि Read more »

CRS inspects doubling & electrification of Nandganj-Taraon on NER’s Varanasi division

CRS inspects doubling & electrification of Nandganj -Taraon on NER’s Varanasi division Read more »