CR Bhusawal Division: Automatic Block Signalling commissioned on Jalgaon–Shirsoli–Mhasavad section

Central Railway’s (CR) Bhusawal Division successfully commissioned Automatic Block Signalling (ABS) on the 21.02-km Jalgaon–Shirsoli–Mhasavad section on September 8, 2026.

Salient features are as follows:

  • Four-aspect auto signalling with Frausher make MSDAC in dual detection & real-time monitoring, with supervisory track section and auto reset mode
  • 29 New Auto signals, 8 semi-auto signals as per SIP & Roll Plan
  • 150 Nos of MSDAC-DP (72 Nos on UP line & 78 Nos on DN line)
  • 48-fiber OFC laying done
  • FN-MUX is used for ICC as well as for ABS display at station
  • Enhanced safety and reliability with ELDs, fuse alarm safety & RDSO-approved fire alarm system.
  • Earthing of auto huts as per RDSO TAN
  • Alteration in SHIRSOLI KYOSAN EI -62 routes.
  • Provision of EI at AH-36, AH-35 of Siemens make
  • In this work, auto huts were constructed as a part of the composite work of ABS.

The commssioning of automatic signalling on the Jalgaon–Shirsoli–Mhasavad section of CR’s Bhusawal Division will improve safety, reliability and  efficiency of train operations.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *