The Chairman, Railway Board and CEO also inspected the Newly Modified High Speed Automobile Carrier (NMGH) coach. Read more
Central Railway’s freight loading from April to October 2021 is the Best and Highest ever during April to October. Read more
Doubling for one of the last sections on the Mumbai Chennai route has been completed and the second line commissioned after CRS inspection on 27th Read more
Doubling of the Washimbe-Bhalwani section between Daund and Kurduwadi was completed today. Read more
Central Railway will operate special traffic blocks at Lonavala including station and yard lines for commissioning of Electronic Interlocking (EI). The blocks will be operated from 27.10.2021 to 30.10.2021. However,… Read more
Diva-Ratnagiri-Diva Daily Special extended from 01.11.2021 to 30.11.2021 Read more
The number of Mumbai Local Train services will go back to pre-covid levels, but only restricted groups to be allowed for now. Read more
Composition: Total 17 Coaches = AC Chair Car - 01 Coach, Second Seating - 14 Coaches, SLR - 02. Read more
Engineering works are being carried out for Commissioning of Double Lines between Bhalwani – Washimbe railway stations Read more
