Mumbai Megablock: Central Railway Plans Maintenance Related Downtime on Sunday

Central has planned blocks to carry out maintenance this Sunday. See details below:

Central Railway’s Block Schedule

Central Railway, Mumbai Division will operate Mega Block on its suburban sections for carrying out various engineering and maintenance works on 1.11.2020.

Thane-Kalyan Up and Dn fast lines from 10.30 am to 3.30 pm

Dn fast line services leaving Chhatrapati Shivaji Maharaj Terminus from 9.33 am to 2.48 pm will be diverted on Dn slow line between Mulund and Kalyan stations, halting as per respective scheduled halts.

Up fast line services leaving Kalyan from 10.26 am to 3.19 pm will be diverted on Up slow line between Kalyan and Mulund stations, halting as per respective scheduled halts. 

Panvel-Vashi on Up and Dn harbour lines from 11.05 am to 4.05 pm

Up Harbour line services towards Chhatrapati Shivaji Maharaj Terminus Mumbai leaving Panvel/Belapur from 10.33 am to 4.01 pm will remain cancelled.

Dn Harbour line services to Belapur/Panvel leaving Chhatrapati Shivaji Maharaj Terminus Mumbai from 9.44 am to 3.16 pm will remain cancelled.

Up Trans-Harbour line service towards Thane leaving Panvel at 2.24 pm and Dn Trans-Harbour line service to Panvel leaving Thane at 1.24 pm will remain cancelled.

However, special trains will run on Chhatrapati Shivaji Maharaj Terminus-Vashi section during the block period.

Thane-Vashi Transharbour line services will be available during the block period.

Related Posts

Got something to say? Post a comment!