SWR: Devarapalle-Hindupur Double line with Electrification Commissioned

The new 10.7 Km double line with 25 KV Electrified section from Devarapalle to Hindupur was commissioned on 15.12.2021 after Statutory inspection and speed Trial by Shri Abhai Kumar Rai, Commissioner of Railway Safety (CRS) southern Circle.… Read more