IR sanctions final location surveys for six lines in Tamil Nadu Read more
Solar fencing at ground level with electric voltage of 12V have been installed to deter elephants from crossing the track Read more
The Traffic Block has been cancelled as works could not be taken up due to rains and water logging. Read more
Unviable projects on IR start getting the axe Read more
