हबीबगंज-बरखेड़ा तीसरी लाइन का कार्य पूर्ण

हबीबगंज-बरखेड़ा तीसरी लाइन का कार्य पूर्ण Read more

Railway Electrification in full swing in South Western Railway

692 RKM more targeted for electrification by Mar 2022 in SWR Read more

Central Railway sets record of Best ever Freight Loading in October

Central Railway’s freight loading from April to October 2021 is the Best and Highest ever during April to October. Read more

ECoR: Bhubaneswar-Palasa special to halt at six more stations

The train will also run with revised timings and revised composition with fully unreserved till further advice. Read more

Member OBD Reviews East Coast Railway Performance

Member OBD stressed on increasing line capacity and speeding up of doubling and tripling projects Read more

Heritage Railway Museum inaugurated at Bhubaneshwar

The aim of establishing a Rail Museum at Bhubaneswar is to preserve the old Railway equipments, to showcase the rich history of Railways in the region Read more
Mumbai Chennai Route - Washimbe Bhalwani CRS Inspection

Mumbai Chennai Route: 26 Km Washimbe – Bhalwani CRS Inspection Done, Line Commissioned

Doubling for one of the last sections on the Mumbai Chennai route has been completed and the second line commissioned after CRS inspection on 27th Read more
Central Railway - Mumbai Chennai Doubling Work

Mumbai Chennai Route Doubling Nears Completion, 26 Km Washimbe – Bhalwani Done

Doubling of the Washimbe-Bhalwani section between Daund and Kurduwadi was completed today. Read more
Mumbai Local Train Entering Andheri Station

Mumbai Local Trains Return to Pre-COVID Services From 28th, See Who Can Travel

The number of Mumbai Local Train services will go back to pre-covid levels, but only restricted groups to be allowed for now. Read more

Major Blow To Station Redevelopment? Indian Railways Shuts IRSDC, Zones Take Over Projects

Ministry of Railways will shut down IRSDC and hand over station redevelopment back to zones Read more