Central Railway - Mumbai Chennai Doubling Work

Kurduwadi-Pangri, Solapur-Hotgi Electrification CRS Inspection From Dec 8

The sections are Kurduwadi-Pangri single line section between Kurduwadi - Latur on December 8 and the Solapur-Hotgi double line on December 9. Read more

Railway Recruitment: RRBs results of the 1st Stage Computer Based Test (CBT-1) to be declared tentatively in January, 2022.

2nd Stage Computer Based Test (CBT-2) for shortlisted candidates is likely to be scheduled during 14-18 February , 2022 Read more

Bharat Gaurav Trains: Southern Railway gets first registered service provider

Service providers will be at liberty to decide business model and tariff based on the level of services for these trains Read more

MAHSR: NHSRCL Signs Agreement For Anand-Sabarmati Package with IRCON-DineshChandra JV

NHSRCL and an IRCON-Dineshchandra Joint Venture today signed an agreement to design and construct stations and viaduct between Anand and Sabarmati for the Mumbai Ahmedabad High Speed Rail project. Read more

Goods train operations commence on the newly converted Botad-Ahmedabad section

Goods train operations commence on the newly converted Botad-Ahmedabad section Read more

ECoR breaks through 840m long tunnel on Talcher-Bimalagarh new line project

ECoR breaks through 840m long tunnel on Talcher-Bimalagarh new line project Read more

ECoR: Breakthrough of Tunnel on the new line between Talcher-Bimalagarh

Talcher-Bimlagarh new BG Rail Link Project (149.78Km) was sanctioned in the year 2003-04 Read more

IR to run theme-based Bharat Gaurav tourist trains

IR to run theme-based Bharat Gaurav tourist trains Read more

पश्चिम मध्य रेल : बरखेड़ा-बुदनी घाट रेलखण्ड पर 67 ब्रिजों का निर्माण

पश्चिम मध्य रेल : बरखेड़ा-बुदनी घाट रेलखण्ड पर 67 ब्रिजों का निर्माण Read more

टोरी-लातेहार रेलखंड पर रिचुगुटा-डेमू स्टेशनों के बीच अप लाईन परिचालन हेतु फिट

टोरी-लातेहार रेलखंड पर रिचुगुटा-डेमू स्टेशनों के बीच अप लाईन परिचालन हेतु फिट Read more