Gwalior Bhopal Express to be short terminated at Guna

West Central Railway has decided to short-terminate 12198/97 Gwalior –Bhopal express due to track maintenance works between Bhopal and Guna on March 25 and 26. Read more

Ernakulam – Angamali Line Block: 3 hrs a day till 25th April

The Ministry of Railways has approved a line block of 3 hrs in Ernakulam Town (ERN) to Angamali (AFK) UP line section for 6 days a week Read more

Dadar South FOB to be shut temporarily for repairs starting March 17

During the inspection, it was decided that the ramp at platform number 1 and the staircase on platform 2 and 3 be closed temporarily Read more
Western Railway Headquarters, Churchgate

WR Jumbo Block on March 17

A jumbo block will be taken from 10.35 hrs to 15.35 hrs on Up and Down slow lines on Sunday, March 17 between Borivali and Goregaon stations Read more

Traffic and Power Block between Asangaon and Kasara on March 17

Central Railway will operate a Traffic and Power Block between Asangaon and Kasara Up and Dn lines for the launching of FOB girders and removal of redundant OHE structures on… Read more

Road-over-bridge girder launch this weekend on Mumbai suburban – CR services to be affected

Central Railway will launch the plate girders of the proposed Road Over Bridge between Kurla and Sion at Km 13/7 on March 16 and 17 (Midnight of Sat / Sun)… Read more

Power Block on CR tonight

Central Railway will operate a traffic and power block for the launching of girders for 6-meter wide foot over bridge at Ambivali station on the intervening night of March 9… Read more

Signalling works in Delhi division, 8 WR trains re-routed

Signalling works between Ghaziabad and Saharanpur due to doubling of the section has resulted in a slew of trains from Western Railway being re-routed via Delhi Shahdara-Shamli. They are: Train… Read more

Night Block for launching FOB on Mumbai suburban

Central Railway will operate a traffic and power block on both the Up and Down lines between Khadavli and Asangaon from 01.15 hrs to 03.00 hrs on March 1 (midnight… Read more

IR may surpass electrification targets for FY 18-19

Indian Railways (IR) is looking at surpassing the target in the present fiscal year Read more