Indian Railways is adopting Condition Based Maintenance, Online Monitoring of Rolling Stock (OMRS) and Predictive Maintenance techniques for Smart Yards on its network to improve safety, reliability and efficiency. Read more
South Central Railway, has taken 30 trains on electric traction during the current fiscal FY20 Read more
288 locomotives on SER with RTIS. Trains hauled by RTIS device enabled locomotives can be plotted in train control chart automatically.It gives mid-section location updates and current speed. Read more
IR to procure 44 semi-high speed train sets. These train sets will be procured in multiples of basic Units of four coaches each which can be attached or detached from… Read more
LHB rake for Chennai Coimbatore Inter-city express. Read more
300 locos produced as on date by CLW. The number of working days for production of 300th loco has reduced from 292 days inFY18 to 249 days in FY19 and… Read more
Railways have converted the 3rd rake out of 5 rakes of 16339/16340 Mumbai – Nagercoil Express and 16351/16352 Mumbai-Nagercoil Express into LHB rake on permanent basis as under: The third rake… Read more
Central Railway has decided to run 3 pairs of trains for Nagercoil/Thiruvananthapuram hauled by electric loco end to end. The following are the pairs of trains. 16340 Nagarcoil – Mumbai… Read more
Inaugurating the Conference, Member (Rolling Stock), Railway Board, Shri Rajesh Agrawal said the aim is that 45 per cent of total freight movement in the country should be by rail. Read more
The Indian Railways should pause a while and consider whether these may actually be the wrong class of trains which are being prioritized for this format Read more