ER: Disruptions Due to Track Maintenance at Howrah Yard

For track maintenance work at Howrah Passenger Yard, 480 minutes Traffic & Power block from 00:15 hrs. to 08:15 hrs. on the night of 30.11/01.12.2019 (Saturday/Sunday) will be required Read more

SR: General Manager Conducts Annual Inspection in Madurai Division

John Thomas, General Manager, Southern Railway conducted annual inspection at major and minor stations of Madurai Division and reviewed the Division’s performance Read more

CR: Changes to Train Schedules due to Work Between Karjat and Lonavala

Central Railway will undertake infrastructure work on southeast ghat between Monkey Hill and Karjat on Up line upto 31.12.2019. Due to this, the train running pattern will change. Details inside Read more

Rs 9768 crore for track repairs & maintenance: Piyush Goyal

Rs 9768 crore for track maintenance until October 2019. IR has taken several measures to avoid accidents and improve safety. These include changes in track structure, rails and mechanised maintenance. Read more

WR: Jumbo Block Between Borivali and Goregaon on 24th November

To carry out maintenance work of tracks, signaling & overhead equipment, a jumbo block will be taken on Up & Dn slow lines between Borivali and Goregaon from 10:35 hrs… Read more

SR: Line Block Cancelled Between Chennai and Gudur

The Line Block announced earlier between Dr.M.G.R Chennai Central – Gudur section today i.e., on 20th November 2019 and consequent cancellation of train services in Dr.M.G.R Chennai Central – Gudur… Read more

SR: Change in Pattern of Train Services

as a part of ongoing Engineering works, Line Block/Power Block is permitted between Dr. M.G.R Chennai Central and Arakkonam Section at Ambattur Yard from 00:20hrs to 03:20hrs (3 hours) on… Read more

Railway Board : MAINTENANCE STUDY GROUP MEETING ON TRACTION DISTRIBUTION HELD AT BHAVNAGAR DIVISION

The 31st Maintenance Study Group Traction distribution meeting was held at Somnath on 8th and 9th November, 2019. Western Railway provided the logistic support for the successful conduct of this important meeting attended… Read more

SCR/SWR: Trains Cancelled due to Traffic Block on Vijayapura Section

Trains cancelled due to traffic block in Vijayapura section Read more

WR: Part of South End FOB at Mahim to be Closed Between 12th Nov-26th December

at Mahim Rly station, the west span of this FOB over up & down slow lines between PF No. 2/3 & PF No.1 including north side staircase of this FOB… Read more