Work on the 109 route km / 133 track km single line section was carried out by Kalpataru Power Transmission Ltd for Indian Railways Read more
Mumbai-Ahmedabad Bullet Train: Technical Bids for 18 km Viaduct, Ahmedabad, Sabarmati Station Opened
Six bidders participated in the process. The financial bids of the successful bidders after the evaluation of technical bids will be opened. Read more
With multiple incidents of Indian Railways' coaches reported as catching fire and the coming summer season, Indian Railways has launched an awareness and enforcement drive to prevent more cases. Read more
CR loaded 246 rakes with automobiles as against 118 loaded in the corresponding period of FY 2019-20 Read more
This includes supervision of all 13 civil works packages including Viaducts, Concrete/Steel bridges, Tunnels (Undersea & Mountain tunnels) Read more
2.306 MWp Solar Plant has been installed on the roof top of Headquarters, Garden Reach and four Divisions viz. Kharagpur, Adra, Chakradharpur and Ranchi. Read more
CRS inspected the newly electrified section of Hapa - Kanalus (High rise OHE upto Kanalus) &Khambaliya- Bhatiya section of Rajkot Division Read more
Trains will be regulated due to Pre Non Interlocking work from 20.03.2021 to 25.03.2021 and Non Interlocking work from 26.03.2021 to 28.03.2021 for commissioning of Kudachi and Raybag Phase –… Read more
These LHB Economy class coaches, after necessary sanctions, shall be inducted in all Mail / Express trains running with LHB coaches (except Rajdhani, Shatabdi, Duronto and Jan Shatabdi etc. special… Read more
ट्रेन संख्या 02974 पुरी - गांधीधाम विशेष की 20 मार्च, 2021 से शुरू होने वाली सेवा अहमदाबाद और गांधीधाम के बीच आंशिक रूप से रद्द रहेगी। Read more
