CR loaded 246 rakes with automobiles as against 118 loaded in the corresponding period of FY 2019-20 Read more
This includes supervision of all 13 civil works packages including Viaducts, Concrete/Steel bridges, Tunnels (Undersea & Mountain tunnels) Read more
2.306 MWp Solar Plant has been installed on the roof top of Headquarters, Garden Reach and four Divisions viz. Kharagpur, Adra, Chakradharpur and Ranchi. Read more
CRS inspected the newly electrified section of Hapa - Kanalus (High rise OHE upto Kanalus) &Khambaliya- Bhatiya section of Rajkot Division Read more
Trains will be regulated due to Pre Non Interlocking work from 20.03.2021 to 25.03.2021 and Non Interlocking work from 26.03.2021 to 28.03.2021 for commissioning of Kudachi and Raybag Phase –… Read more
These LHB Economy class coaches, after necessary sanctions, shall be inducted in all Mail / Express trains running with LHB coaches (except Rajdhani, Shatabdi, Duronto and Jan Shatabdi etc. special… Read more
ट्रेन संख्या 02974 पुरी - गांधीधाम विशेष की 20 मार्च, 2021 से शुरू होने वाली सेवा अहमदाबाद और गांधीधाम के बीच आंशिक रूप से रद्द रहेगी। Read more
The guidelines include action plan, preventive measures, sensitization, surveillance over the identified vulnerable area, notice for passengers and special measures Read more
रेलवे बोर्ड ने सभी जोन को 10 अप्रैल 2021 तक COVID-19 महामारी से पूर्व चलने वाली ट्रेनों के 90 प्रतिशत संख्या को फिर से शुरू करने में सक्षम बनने के… Read more
Indian Railways asks zones to prepare to start additional trains and bring total number of services to 90% of pre COVID-19 levels. Read more
